I-view Digi-4800XP 16 channels Hybrid Embedded DVR Instrukcja Użytkownika Strona 26

  • Pobierz
  • Dodaj do moich podręczników
  • Drukuj
  • Strona
    / 48
  • Spis treści
  • BOOKMARKI
  • Oceniono. / 5. Na podstawie oceny klientów
Przeglądanie stron 25
26
2-3. Central Process Unit (CPU) Installation
2-3-1. CPU Installations: Power Management Setup
The DVR’s board comes with a surface mount Socket 775 (LGA775) design for Intel Pentium 4
Processor in the 755-land package.
Follow the steps below for CPU installation
1.) Locate the CPU socket on the platform. (Fig. 2-3.1).
2.) Press the load lever with your thumb (A) and remove it to the left (B) until it is released from the
retention tab. (Fig. 2-3.2)
3.) Lift the load lever in the direction of arrow to a 135-degree angle. (Fig. 2-3.3).
4.) Lift the load plate with your thumb and forefinger to a 100-degree angle (A), and then push the
PnP cap from the load plate window to remove (B). (Fig. 2-3.4).
5.) Position the CPU over the socket, making sure that the gold triangle is on the bottom-left corner
of the socket. The socket alignment key should fit into the CPU notch. (Fig. 2-3.5).
Fig.2-3-1.1
Fig.2-3-1.2
Fig.2-3-1.3
Fig.2-3-1.5
Fig.2-3-1.4
Fig. 2-3-1.6
Przeglądanie stron 25
1 2 ... 21 22 23 24 25 26 27 28 29 30 31 ... 47 48

Komentarze do niniejszej Instrukcji

Brak uwag